or
Book call on your favorite time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Amazon Services

Buy - Heating Tube

  • South Korea South Korea  
  • Last Updated:
    Posted on: 07 May 2021

RFQ Details

"#51172-O8. SMS Line Pipe API 5L X52
The above number appears on all quotation and related correspondence.
This inquiry implies no obligation on our part. Changes or suggestions offering cost economies are solicited.
All disputes in relation to this document(s) shall be finally settled by arbitration in Korea
We have new requirement for Line Pipe as per attached & request you to please
quote your best price on following:

1-Prices CIF Dubai required by December 31, 2008.
2-Advise your best delivery.
3-Offer valid for 105 days from quote date.
4-Manufacturer Name & Country of Origin.
5-Type of Packing.
6-Est. Weight & Volume of shipment.
7-Technical Data of quoted product.
8-Product Guarantee.
9-Any deviation for specification to be clearly stated & supported by documents.

ITEM

DESCRIPTIONS
QTY
LINE PIPE LMTR
1 API 5L X52, PSL2, SEAMLESS ACCORDING TO API 5L (42nd EDITION) AND IPS-M-190(2) 17,400
LATEST EDITION SUITABLE FOR SOUR CONDITIONS.
ELECTRIC FURNACE OR OPEN HEARTH STEEL OR BASIC OXYGEN STEEL.
ENDS BEVELLED AT AN ANGLE OF 30 DEG. ( +5) DEG (-)' 0' DEG.
SUPPLIED BARE AND UN OILED IN RANDOM LENGTHS OF AVE. 11.6 METER AVE. MIN.
10 METER MAX. 12.8 METER.
COLOUR CODING GREEN, 2 IN. (50MM) DAUB PAINT ON INSIDE SURFACE AT BOTH ENDS.
SIZE: 16 IN. NOM x 9.52 MM WALL THICKNESS

















NOTES:




1. INSPECTION CERTIFICATE AND MANUFACTURING DOCUMENTS AS SPECIFIED IN IPS- M- PI- 190 (2) AND API 5LX

IS REQUIRED.




2. THE ABOVE ITEM HAVE TO BE MANUFACTURED IN ACCORDANCE WITH NACE STANDARD # MR-01-75.

3. SCOPE OF INSPECTION KSI NO. 60 APPLICABLE TO THIS ENQUIRY AS BELOW






Scope Of Inspection KSI NO. 60

Seamless Pipe & Tube

01- Technical Inspection shall be carried out to ensure that the material supplied are fully in compliance with the purchase order specification, reference standards and technical data.

02- Verification of QA plan and checking mill and QC system.

03- Visual & Dimensional Che