or
Book call on your favorite time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Code
       


Copper Cathode 99.99% 1000 MT X 12 months

  • India India  
  • Quantity Required: 1000 Metric Ton
  • Annual Purchase Volume: 12000 Metric Ton
  • Last Updated:28 May 2019
  • Buying Frequency: Monthly
  • Payment Terms: T/T
  • Shipping Terms: CIF
  • Destination Port: Sanghai

RFQ Details

COMMODITY: Electrolytic Copper Cathodes
Purity: 99.98%
⢠Chemical composition: Copper Cathode Grade A
⢠Copper Cathodes 99.98% purity
⢠Electrolytic Grade A: Premier degree size: 914mm x 914mm x 12mm (approx.)(36â x 36â x0.5)
⢠Weight of each sheet: 125kgs +/- 1% net
⢠Weight of each pallet: 2m/t +/-1%
⢠Minimum weight of each container of copper cathode: 25 m/t approx.
⢠Gross weight of each container: 22.2m/t approx.
QUANTITY
⢠Trial quantities of 100MT, 1000 MT per month for 1 year with rolls and extensions.
⢠The unit of measurement in this contract is Metric Tons (MT).
⢠Months are calendar months according to the Gregorian calendar.
⢠The goods will be delivered within 30 days after the Buyer and seller signs the contract.
⢠The quality of goods will be confirmed on a certificate issued by SGS, an independent international inspection company at loading port by SALE AND PURCHASE AGREEMENT
QUALITY
⢠The Electrolytic Copper Cathodes shall conform to London Metal Exchange (LME) standards and specifications in Appendix A.
⢠The quality of the goods shall be confirmed by a certificate issued by an independent international inspection company which shall be binding on both parties in all respects, including, but, not limited to the replacement of faulty goods paid for by the buyer.
⢠Buyer will not accept faulty goods.
⢠Inspection report must be done for each container of goods.
PACKING
⢠Palletized, banded by aluminum bands in bundles of 20 Cathodes, and packed into 20ft containers.
DELIVERY TERMS
⢠CIF, Shanghai, Hong Kong, Guangzhou and other ports in China as per delivery schedule.
⢠Buyer must advise Seller of any changes in quantity and change of destination port prior to shipping
⢠Cost of inspection by SGS at loading port shall be borne by Seller.
⢠Buyer shall bear the cost of SGS inspection at destination Port.
⢠Seller shall provide to Buyer all ot


Attachment

To view attachment please Sign In Now! Not a member yet? It takes less than a minute to Join FREE now!