or
Contact Us
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Mini Hydro Power Project Packge

  • Ethiopia Ethiopia  
  • Last Updated:
    Posted on: 31 Oct 2024

  • Destination Port: Ethiopia

RFQ Details

We are looking for engineering firms, suppliers or manufacturers who can supply us all the necessary equipment and goods for the realization of Mini Hydro Power Generating and power distribution project packages in the range of 200 KVA to 400 KVA rating. This includes but not limmitted to the design and supply of :
1. Turbines
2. Panestock
3. Surge tank
4. Electrical switch gear
5. Electrical Cables
6. Transformers
7. Generators etc

Interested companies please contact us immediately.

Zebedirsan Aklilu
Crown Engineering PLC.
e-mail xxxxx
Tel. +251 11 4 40 35 38
Mobile +251 911 50 48 25
Fax +251 11 4 42 49 65
P.O.Box 1495
Addis Ababa, Ethiopia