or
Contact Us
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

New or Used sheet pile required

  • India India  
  • Quantity Required: 200mt x 5 mt height
  • Last Updated:
    Posted on: 19 Feb 2024

  • Destination Port: chennai

RFQ Details

sheet pile is required for pile cap construction for retaining wall in the open drain. The pile cap is 3meter below the ground level. Sheet pile has to be removed and reinstalled every one week after pile cap concreteing. Total length of the retaining wall is 3 km and length of sheet pile required is only 200 rmt with 5meter length each.